DATA ONE COM SIREN 102234184

Portfolio

Case studies

Concrete, quantified and reproducible projects. Some client names are anonymised at the request of the contracting parties (confidentiality clauses).

CAS-01 · Retail

38 points of sale connected with fibre + SD-WAN

Context : a multi-site retail chain was running heterogeneous links and end-of-life private branch exchanges. Objective : unify the network, make payment more reliable and prepare for the PSTN switch-off.

  • Business fibre and 4G back-up on every site, centralised monitoring
  • Full migration of the PBX to a Cloud PBX with number portability
  • Coordinated site-by-site cutover, with no store closure
38
sites connected
-60%
link incidents / year
1
single contract

CAS-02 · Logistics

Wi-Fi coverage and 220 DATA points on an 18,000 m² platform

Context : a regional logistics platform saw its scanners lose connection in dense zones. Objective : continuous radio coverage and durable structured cabling.

  • Preliminary radio survey and deployment of industrialised access points
  • Delivery of 220 copper/fibre DATA points with per-point acceptance
  • Traffic segmentation (IT, scanners, security, guests)
18km²
area covered
220
DATA points delivered
0
residual dead zone

CAS-03 · Healthcare

Redundant VoIP telephony for a group of clinics

Context : a group of clinics needed to make communication between reception, care and administration more reliable, with a requirement for maximum continuity and confidentiality of exchanges.

  • Dual carrier access and automatic cellular failover
  • Cloud PBX with dedicated call queues per department and secure voicemail
  • Strictly GDPR-compliant processing (DPA with partners)
99.9%
availability held
3
facilities
<4h
average MTTR

CAS-04 · Public sector

Structured cabling lot for a local authority

Context : a local authority awarded a cabling and patching lot as part of a tender. Objective : flawless, documented execution.

  • Response to the tender with a technical memorandum and compliant price schedule
  • Delivery of racks, patching and enforceable acceptance, with plans and records handed over
  • Compliance with contractual deadlines and associated penalties
100%
compliant acceptance
0
delivery delay
D+15
final file delivered

Does your project resemble one of these cases ?

Let's talk figures and deadlines.

Request a detailed feasibility study, with no obligation.

Request a study / a quote